Each lab job can have the stage of work added and updated along the way. Ensure all stages are entered to enable accurate tracking.
-
Go to Location Setup > System Tables tab
-
System Tables Group: Laboratory Stages
-
Click Add
-
Enter the new stage(s)
-
Place a tick in Active
-
Comments
Article is closed for comments.